Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 20 results ...

Adjei, K O (2020) A model for predicting cost control practice in the Ghanaian construction industry, Unpublished PhD Thesis, , University of Johannesburg.

Agumba, J N (2013) A construction health and safety performance improvement model for South African small and medium enterprises, Unpublished PhD Thesis, , University of Johannesburg (South Africa).

Ansah, S K (2018) An integrated total quality management model for the Ghanaian construction industry, Unpublished PhD Thesis, , University of Johannesburg (South Africa).

  • Type: Thesis
  • Keywords: 15/09/2022
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/2485626877
  • Abstract:
    This research project investigated and modelled Total Quality Management (TQM) for the Ghanaian construction industry. The primary aim of the research was to model the extent to which Leadership/Top Management features, Company Supplier Quality Management features, Client Focus and Involvement features, Company Quality System Evaluation features, Company Vision and Plan Statement features, Product Design Management features, Product Selection Management features, Construction Process Management and Improvement features, and Construction Employees’ Involvement and Motivation features predict TQM for the construction industry, these factors being classified as the exogenous variables. Mixed-methods research which involved both Qualitative and Quantitative approaches was adopted for the study. Empirical data was collected through a Delphi study and a field questionnaire survey. Analysis of results from the Delphi study was done with Microsoft Excel to output descriptive statistics. A conceptual integrated TQM for the Ghanaian construction industry model was based on the theory developed from literature review findings and the Delphi study. A questionnaire survey was conducted among the top management working in the construction industry in Ghana. From the 641 sample questionnaires, 536 questionnaires were returned which represents 83. 62 per cent. An exploratory factor analysis (EFA) was conducted on the initial eight-factor constructs and their variables to determine their reliability for their inclusion in the confirmatory factor analysis (CFA). Nine-factor constructs were realized after the EFA factor loading test. Further, CFA was conducted on these nine-factor constructs using structural equation modelling (SEM) software with Eqations (EQS) version 6. 2 software programme to validate and determine their reliability and inclusion in the final model. Findings from the literature on TQM studies revealed the theory that TQM implementations and practices and the latent variables lead to TQM in the construction industry. Findings from the Delphi study revealed that several factors (Leadership/Top Management features, Company Supplier Quality Management features, Client Focus and Involvement features, Company Quality System Evaluation features, Company Vision and Plan Statement features, Product Selection and Design Management features, Construction Process Management and Improvement features, and Construction Employees’ Involvement and Motivation features) were considered to be the most important determinants of TQM in the Ghanaian construction industry. Both findings revealed that TQM could be considered as an eight-factor model defined by the influence of TQM practices and experts in construction. . .

Coffie, G H (2018) Development of a cost-predicting model for construction projects in Ghana, Unpublished PhD Thesis, , University of Johannesburg (South Africa).

Eyiah-Botwe, E (2017) Development of a sustainable stakeholder management framework for construction projects in Ghana, Unpublished PhD Thesis, , University of Johannesburg.

Grobler, K (2000) Improving the effectiveness and image of the building and civil construction process, Unpublished PhD Thesis, , University of Johannesburg.

Ladzani, M W (2009) Evaluation of small and medium-sized enterprises' performance in the built environment, Unpublished PhD Thesis, , University of Johannesburg (South Africa).

Makabate, C T (2021) Investigating the adoption of building information modelling (BIM) within the small medium enterprises (SMEs) in contracting and consulting organisatios in the South African construction industry, Unpublished PhD Thesis, , University of Johannesburg.

Marnewick, C (2008) Ensuring succesful erp implementations using the vision-to-project framework, Unpublished PhD Thesis, , University of Johannesburg (South Africa).

Marxen, K (2017) Demand guarantees in the construction industry: A comparative legal study of their use and abuse from a South African, English and German perspective, Unpublished PhD Thesis, , University of Johannesburg.

Musonda, I (2012) Construction health and safety (H&S) performance improvement: a client-centred model, Unpublished PhD Thesis, , University of Johannesburg.

Mwanaumo, E M (2013) An integrated approach to multi-stakeholder interventions in construction health and safety, Unpublished PhD Thesis, , University of Johannesburg (South Africa).

Nkomo, M W (2020) Assessment of mentoring of construction workers in the South African construction industry, Unpublished PhD Thesis, , University of Johannesburg.

Nyakala, K S (2017) Developing a road construction quality assurance process measurement tool: The case of Mopani district municipality, Unpublished PhD Thesis, , University of Johannesburg.

Ogunsanya, O A (2018) Integrated sustainable procurement model for the Nigerian construction industry, Unpublished PhD Thesis, , University of Johannesburg (South Africa).

Ojo, E M (2016) Assessment of green supply-chain management in South African and Nigerian construction firms, Unpublished PhD Thesis, , University of Johannesburg (South Africa).

Shikweni, S (2018) Talent management in the South African construction industry, Unpublished PhD Thesis, , University of Johannesburg (South Africa).

Somiah, M K (2018) An integrated competitive advantage model for indigenous construction firms in the Ghanaian construction industry, Unpublished PhD Thesis, , University of Johannesburg (South Africa).

Yankah, J E (2018) An integrated framework of marketing in construction contracting enterprises in the Ghanaian construction industry, Unpublished PhD Thesis, , University of Johannesburg (South Africa).

Zaayman, L (2017) Optimisation of mechanised maintenance management of railway track infrastructure, Unpublished PhD Thesis, , University of Johannesburg.